Difference between revisions of "Notes20110620"

From Net-SNMP Wiki
Jump to: navigation, search
Line 19: Line 19:
 
**** '''Wes will decide on exact timing after 5.3/4 get released'''
 
**** '''Wes will decide on exact timing after 5.3/4 get released'''
 
**** '''If there is enough time to do the makerelease changes before 5.7 then he'll update then release, otherwise the switch will be afterward'''
 
**** '''If there is enough time to do the makerelease changes before 5.7 then he'll update then release, otherwise the switch will be afterward'''
*** More Documentation; see [[Category:Git]]
+
*** More Documentation; see [[:Category:Git]]
 
*** rebase vs merge
 
*** rebase vs merge
 
** LTS Timing
 
** LTS Timing

Revision as of 19:16, 20 June 2011

Previous: 2011-05-23
Next: 2011-08-01

This is the meeting agenda/notes for the Meeting held on 2011-05-23.

Date and Time: 2011-05-23 19:00 UTC


Agenda

  • Next Meeting
    • August 1st
  • Releases
    • 5.3.4
      • will release final this week
    • 5.4.4
      • will release final this week
    • 5.7
      • rc2 this week, final next
  • Administrative
    • Switching to GIT
      • Timing choices
        • Wes will decide on exact timing after 5.3/4 get released
        • If there is enough time to do the makerelease changes before 5.7 then he'll update then release, otherwise the switch will be afterward
      • More Documentation; see Category:Git
      • rebase vs merge
    • LTS Timing
      • From last time: 5.4 and 5.7 will be LTS
      • Time to shut down 5.3 right?
      • Need a wiki page describing the cycles and showing examples from Notes20110523
  • Technical
    • HR-MIB and RPM
    • the infamous oid typedef issues
      • 6.0?
    • Windows Builds
      • Dave hopefully has windows working? Needs wiki post about doing it.
  • Round Table